The installation of the meter must be performed by qualified personnel familiar with the safety instructions and technical information in the user manual.
Live parts of the meter must never be touched; power must be disconnected during assembly and disassembly.
After installation, all electrical parts (terminal cover, exposed wire ends) must be securely sealed, leaving no exposed energized conductors.
The outer surface of the meter must not be cleaned with solvents or abrasive cleaning agents.
Suitability of the meter type for the grid and installation must be verified by qualified personnel. Incorrect meter selection or wiring may damage the meter and void warranty coverage.
Calibration and programming operations are performed during manufacture, and each meter is submitted for use after thorough quality inspection. There is no maintenance or user-serviceable programming required.
Satera Electricity Meters are high-technology products conforming to international standards. All technical data and documentation are the proprietary intellectual property of the company.